Laserfiche WebLink
Pond / ~~o,~e`t~,i- >>~,un NPDES No. ~°•% <br />Date of Inspection ~'~8.~~ / >' , ~' i <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: <br />2. Erasion forming gttllies: <br />3. Is wave action causing erosion <br />Excellent, Moderate, <br />Extensive, Some, ~, <br />Poor <br />None <br />On the upstream embankment? Yes No ~ <br />At cite principal spillway inlet? /(/~ 5~~(~w'~ Yes /%L No <br />4. Erosion of the downstream tce of the embankment? 1 Yes No v <br />The cause of the erasion is attributed [o: <br />5. is seepage occurring through the dam? <br />Could this seepage cause potential irtstabiliry? <br />PRINCIPAL SPILLWAY N~ SF<~!u'~ <br />1. Is [Ice principal spillway system in working order? <br />2. Is the inlet free of debris and restrictive material? <br />3. [s the discharge outlet free of restrictive material? <br />~. Is erasion occurring at the discharge outler? <br />Yes Na v <br />Yes No <br />Yes No <br />Yes No <br />Yes No <br />Yes No <br />Evaluate the severity: Extenstve Moderate Just Starane None <br />EMERGENCY SPILLWAY ~~• ~,~t~~~,,«, s`;ll~:-s-~/ <br />1. Is the overall emergence spillway rystem capable df pazsi'ng design storm discharge'? <br />Yes Na <br />?. Does it appear as if the emergency spillway has discharged water since dte last inspecuon? <br />` Yes No <br />3. Is erosion occurring at any section of the emergency spillway? Yes No <br />Describe the extent: <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design stornge capacity of the reservoir been surpazsed? Yes <br />Please add •aay special comments concerning potentially dangerous problems oa the back of this <br />sheet! /' ,, <br />Inspected by: {~,~,~L-4,~ ~/. <br />