Laserfiche WebLink
~~.`_, : . <br />- drainage. The proposed sampling site will be located~at the con- <br />fluence of Dowden Gulch and the- east fork of the Williams Fork <br />River. <br />Surface water monitoring wi1T be conducted as follows: <br />Flow measurements will be taken at all surface water monitoring sites <br />twice a year. <br />a. Once during spring snowmelt <br />b. Once during a storm event <br />2. Water samples will be taken from all surface water monitoring sites <br />at the same time as the flow measurements. These samples will be <br />~~ <br />chemically analyzed for the parameters specified below. <br />pH (field) <br />Conductivity at 25°C (field) <br />Temperature {field) <br />Dissolved Oxygen {field) <br />Turbidity {field) <br />Total Suspended Solids <br />Total Dissolved Solids <br />Total Combustible Solids <br />Sodium Absorption Ratio ATuminum.(AT) <br />Bicarbonate (HCO-3) Boron (B) <br />Calcium (Ca+2) Copper (Ca) <br />Flouride (F') Iron (Fe) <br />Magnesium {Mg+2) Lead (Pb) <br />Ammonia (NH3) Manganese (Mn.) <br />Nitrate (N03) Molybdenum (Mo) <br />Sodium (Na+) Selenium {Se) <br />Sulfate (SOq-) Zinc (Zn) <br />3. The results of all hydrology monitoring will be' submitted to <br />the division as the data is collected. <br />M287 <br />.5~:iti t:.Yu~li,il ~~ ll':'tC~~`•'S~iD.'iK`-k'n~i ia~ -v0 ~ 'ieiema..aaP ~"+'~~,IS~` s.. t ~' 'ti +..`~~~Y+H"°` ~ ~-a~eYl~ <br />