My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE61094
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE61094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:47 PM
Creation date
11/20/2007 7:01:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997100
IBM Index Class Name
Permit File
Doc Date
12/10/1997
Doc Name
CONSTRUCTION MATERIALS LIMITED IMPACT OPERATION 110 RECLAMATION PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ,~S <br />• • <br />EXHIBIT "D" <br />Reclamation Recommendations <br />Branson Gravel Pit <br />A11 available top soil will be stock piled during <br />excavation. Upon completion of the mining operations all <br />slopes will be shaped and graded. Finished slopes shall be <br />4:1 or flatter. <br />Top soil will he spread over the entire mined area to a <br />depth of nut less than 4 inches or greater than 13 inches. <br />Gpon completion of top soiling the entire area will be <br />seeded to a cover crop of oats. Oats will be seeded at a <br />rate of 25 to 30 bulk pounds per acre. The cover crop will <br />he seeded prior to May 1st. The cover crop will not be <br />mechanically harvested or grazed. <br />The attached seedins mixture will be drilled into the <br />standing cover crop during tiovember. <br />The entire area will be excluded from grazing until the <br />seeding is fully established. If necessary the area will be <br />--a <br />fe~~."~. <br />Uexious weeds shall be controlled by mechanical or chemical <br />methods. <br />.c~s~i~-e runoff from the site shall be controlled usins <br />dikes. containment reservoirs and drainase culverts as <br />reouired. .. <br />Feclamation Costs <br />Shaping and grading <br />Top soiling <br />Cover Crop-seed & seeding <br />Grass-seed & seeding <br />$ 85.00/hr. <br />150.00/hr. <br />40.00/ac. <br />125.00/ac. <br />°Ii_ECODE:reclainbran <br />
The URL can be used to link to this page
Your browser does not support the video tag.