Laserfiche WebLink
_1 ~. <br />(L) To prevent off-site damage we will build a dike on the <br />north and west boundary of the pit which is the direction of <br />the runoff. The dike will hold excess solids from flowing <br />off site while allowing water to take its natural course <br />onto range land. <br />(M) The rock will be crushed on site. The area where the <br />gravel crusher will be situated is shown in Exhibit "E" map. <br />(N) The primary commodity to be mined is gravel and the <br />intended use is to build and maintain our county road <br />system. <br />(O) Same as item N. <br />