Laserfiche WebLink
E.5-1 Topsoiling Schedule <br />• (Thousands of Yards) <br /> <br />End <br />Year Clearing <br />Dump Site <br />Acres x 4800 = 40% <br />Swell <br />bcy x 1.4 = <br /> <br />lcy to <br />Stockpile <br />lcy from <br /> <br />Inventory <br /> 0 125 600 +840 0 840 <br /> 1 90 - 432 +605 -165 1,180 <br /> 2 50 240 +336 -136 1,380 <br /> 3 15 72 +101 - 46 1,435 <br /> 4 20 96 +135 0 1,570 <br /> 5 15 72 +101 0 1,671 <br /> 6 15 72 +101 0 1,772 <br /> 7 5 24 + 34 0 1,806 <br />• <br /> 8 0 0 0 -1,80E 0 <br /> '9 0 0 0 0 0 <br /> 10 0 0 0 0 0 <br /> I <br /> E-7 <br />