CTL/THOMPSON, INC. Daily Report k4 <br />1701 South Federal Blvd. <br />• Denver, Colorado 80219 DATE 4/3/80 JOB N0. 6209 <br />(303) 934-5473 Eckman Park, Mines 1 and 2 <br />PROJECT Pond A <br />LOCATION Steamboat Springs, Colorado <br />CONTRACTOR R. N. Robinson & Sons <br />T0; ENERGY FUELS CORPORATION <br />OWNER Energy Fuels Corporation <br />BOX G <br />' WEATHER TEMP._oA.M._oP.M. <br />STEAMBOAT SPRINGS, COLO. 80477 <br />PRESENT AT SITE <br />THE FOLLOWING WAS NOTED: <br />Field engineer arrived at Energy Fuel's office at 12:15 p. m. Talked to John <br />Gates and delivered to him four sets of plans and two copies of specifications <br />for Pond A at approximately 1:00 p. m. Contractor was using large backhoe to <br />excavate core trench. Bedrock was encountered at a depth of approximately 16 <br />to 20 feet below ground surface from Sta. 13+50 to Sta. 14+00. East end of <br />core trench at Elev. 6938 is approximately Sta. 13+25. Water was seeping <br />• into trench on south side at approximately 3 to 4 feet above bedrock. Contrac- <br />~ for agreed to put dry soil back into trench to seal off the water. Then, when <br />a long enough portion of the core trench has been opened so that equipment can <br />work in the trench, all dumped material will be pulled from the trench to a <br />depth of 2 to 3 feet into bedrock and placement and compaction of fill will <br />begin. Contractor hopes to start filling by middle of next week. <br />A sample of sand for possible use in blanket drain had been obtained by John <br />Gates. Gradation was set up to run the next day. Sand appears to be clean <br />to slighlty silty with a very small portion being retained on the No. 4 sieve. <br />Almost looks clean enough to use as concrete sand. <br />No density tests were taken, because no fill had been placed. <br />Material excavated from the core trench was being placed in the haul road <br />area, downstream of toe of embankment for Pond A. <br />Problems with walls of core trench being too steep and causing sloughing were <br />mentioned to John Gates. Field engineer recoinnended sloping the walls of the <br />core trench instead of leaving them virtually vertical. <br />Equipment on the site included one 825 Caterpillar self-propelled sheepsfoot <br />roller; three Caterpillar 627 Push-Pull Scrapers, one blade; one D-8, one <br />D-6, and one TC25. <br />• Copies to: ~a-~. <br />Signed Fe~`+ u' "~~~~ <br />Robert U. Branson , Project Engr. <br />