Laserfiche WebLink
Cost Guidelines -Excavation and Disposal • hy~;//oil.cdle.state.co.us/cost'7o20guidelines/ezcvdisp.html <br />Consultants may mark up pass-through (subcontracted) charges, subject to any limitations established by these reasonable cost <br />guidelines. Applicants who perform their own work may not mark up any costs. <br />4-3-49. CONSULTANT LABOR AND FIELD INSTRUMENTATION. <br />Consultant on-site labor allowable for the duration of the excavation, plus two hours. Field instruments such as PIDs <br />(photo-ionization detectors) may be billed separately. <br />4-3-50. MISCELLANEOUS FIELD SUPPLIES. $20/day/site. This includes such items as gloves, baggies, ice, water, <br />rope, pens, etc. No receipts are required. <br />Ji~~r~1 <br />[ State Home I CDLE Home I Oil Inspection Home I Too I Feedback Paee ] <br />Last modified: November 16, 1998 <br />2 0(2 6/30/99 2:57 PM <br />