Laserfiche WebLink
' Reporting <br />An annual report will be submitted to the CDPHE Water Quality Control Division <br />' detailing the following: <br />1. Compliance with the approved SWMP <br />2. Results of the bi-annual stormwater facilities inspection <br />3. Action taken as a result of the bi-annual inspection (if any) <br />4. Any changes in the facility or the stormwater facilities that would affect the <br />SWMP. <br />This report will cover the period January 1 to December 31 of the preceding year and will <br />be filed no later than February 15 of the following year. <br />Training <br />A Stormwater Management Seminar will be included with annual safety training. The <br />Site Environmental Coordinator will oversee the seminar that will be held in conjunction <br />with Spill Prevention and Emergency Response Plan review. Training will include <br />instruction in the following areas: <br />1. Regulated Discharges -Mine Drainage (MD) and Process Water (PW) <br />2. Inspection Requirements <br />3. Good Housekeeping Practices <br />4. Implementation of BMPs used on site <br />5. Spill Response Procedures <br />6. Reporting Requirements and Procedures. <br />Report Updating <br />The Stormwater Management Plan will be reviewed on an annual basis and updated as <br />necessary. <br />Battle Mountain Resources, Inc. Telesto Solutions, /nc. <br />' san mu no.,~»nre. manngemem plaaJoc 27 M¢y 3, 1002 <br />