Fuel Storage and Refueling Area <br />The fuel storage and vehicle refueling areas that were used during active operations have <br />been decommissioned and await final reclamation. The area is north of the mine <br />maintenance building as shown on Figure 1. Fuels were stored in above-ground tanks <br />and were contained within a geomembrane-lined area capable of retaining 110 percent of <br />the largest vessel staged within the containment area. Each of these storage tanks was <br />removed from the property during decommissioning. <br />Mine Equipment Ready Line <br />Mine equipment (i.e., haul trucks, blades, loaders, etc.) was parked on the ready line <br />north of the mine maintenance facility while inactive and when not undergoing <br />maintenance. Currently, the ready line area is used to store incidental equipment <br />associated with reclamation activities. The area is scheduled for final reclamation in <br />either 2003 or 2004. Reclamation shall include soil characterization for potential <br />hydrocarbon sources and mitigation, if necessary. The area will be ripped to alleviate <br />surface soil compaction, contoured, topsoiled, and vegetated. Stormwater runoff from <br />this azea drains to a sediment pond equipped with sorbent booms to allow skimming and <br />separation of oils from the stormwater prior to release. <br />Crusher and Ore Stocknile Area <br />' Ore from the pit was either stockpiled at the crusher facility located east of the mill or <br />was fed directly to the crusher. Primary crushing of the ore was accomplished with a jaw <br />' crusher to reduce the run-of--mine ore to the desired size. From the crusher, ore was <br />carried via an overhead conveyor to a crushed ore stockpile and then fed to the mill via <br />' underground pan feeder belts. At the completion of mining operations, ore contained <br />within the stockpile was campaigned through the crusher and milling facilities. This ore <br />campaigning was completed during November 1996. Runoff from the remaining <br />foundation area drains to the tailing disposal area and adjacent sediment ponds. These <br />' azeas have been decommissioned and await final equipment and structure dismantling <br />and removal followed by reclamation of the areas. These azeas will be contoured, <br />topsoiled, and vegetated. <br />Battle Mountain Resources, Inc. Telesto Solutions, Inc. <br />' rnn luu rmrmwmrmnnagemmtplaadx 6 May 3, 2002 <br />