Laserfiche WebLink
• Drainage from the primary crusher currently enters the active mining area and will eventually <br />pass through the sedimentation pond in Section 2 Township 3 North, Range 93 West as <br />shown on the Hydrology -South Map (Map I2}. Drainage from the Gossard Loadout passes <br />through one of three sedimentation ponds located on the northeast side of the facility as <br />shown on the Hydrology -North Map (Map 11). <br />Stoker Coal Loadout Facility <br />Details conceming the stoker coal loading facility can be found in Exhibit 15, Stoker Coal <br />Facility, Map,21,-Existing Structures -North, Exhibit 7, Hydrology Information and Exhibit <br />8, Air Quality Information. <br />Explosives Storage Area <br />Details concerning the explosives storage facility are found in Exhibit 16 -Explosives <br />Storage Facility, and Map 22, Existing Structures South. <br />The storage facility is in compliance with all requirements of the Mine Safety and Health <br />Administration, Bureau of Alcohol, Tobacco and Firearms and the Colorado Division of <br />Mines. <br />Loadout <br />• Colowyo's Loadout, the Gossard Loadout, is located at the end of the Union Pacific rail line. <br />The only segment of the spur within the permit area is shown on Map Z2A, Existing <br />Structures North. <br />2.05-19 Revision Date: 6/28/05 <br />Revision No.: MR-73 <br />