My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60967
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60967
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:41 PM
Creation date
11/20/2007 6:57:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
3/22/2006
Section_Exhibit Name
2.05 Operations and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Laboratory, Production Office. Personnel Offices and Chancre Room Facility <br />Colowyo maintains amulti-purpose facility covering approximately 2 acres in Section 34, <br />Township 4 North, Range 93 West. This facility contains two structures as shown on the <br />Existing Structures -South Map (Map 22). <br />Coal analysis is performed in the- laboratory portion of the larger structure. Production crews <br />have locker, shower, and toilet -facilities provided in part of the larger structure. The <br />remainder of the larger structure is used for training, safety, crew assembly, and production <br />management offices. The smaller structure contains offices for the Human Resources <br />Department. Included in this area is a paved parking lot used for all production and <br />maintenance personnel based in the area and some company owned small vehicles. <br />Drainage from this area is collected as shown on Map 12 -Hydrology -South Map and Map <br />I2A Gossard and Mine Maintenance Areas. <br />Crushin¢ and Loadout Facilities <br />The coal crushing and loadout facilities include four separate facilities: (1) primary crusher; <br />(2) secondary crusher and train loadout; (3) stoker coal crusher; and (4) stoker loadout siding. <br />The primary crusher facility is located in Section 3, Township 3 North, Range 93 West, as <br />shown on the Existing Structures -South Map (Map 22). Included in the primary crusher <br />• facility are a raw coal stockpile area, a truck dump, a primary crusher, a covered conveyor, a <br />storage bin, and a truck load-out. This facility was constructed in 1979. <br />Coal i:> typically hauled from the pi[ in 170-ton rear dump haulage trucks to the primary <br />crusher site. The coal is then dumped directly into the truck dump hopper, or stockpiled. The <br />truck dump is equipped with dust control spray bars. The coal from the stockpile is fed into <br />the hopper by front-end loaders. Feeders at the bottom of the truck dump hopper discharge <br />the coal into the primary crusher. The primary crusher reduces the raw coal to an <br /> <br />2.05-17 Revision Date: 8/29/97 <br />Revision No.: TR-42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.