2.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND MINING ACTIVITIES - <br />MINIMUM REQUIREMENTS FOR OPERATION AND RECLAMATION PLANS. <br />2.05.3 Operation Plan - Methods and Equipment <br />(1) Methods and Equipment <br />Mining ceased at the Bowie No. 1 Mine on December 4, 1997. No <br />production is scheduled from the mine during this permit term. <br />Historically, in the Bowie No. 1 Mine, the First Main North entries, a <br />nine entry system, accesses the "D" seam from the East Mine Portal <br />Bench and axe driven at a heading of N 19° E. These entries were <br />completed to their projected length as the First North Mains. These <br />entries in turn mined east as the First East Mains. Map 2-5 shows the <br />mining performed through December 9, 1997. <br />The First East Mains were driven from the end of the First North Mains <br />on a heading of approximately N 109°E. The First East Mains were <br />developed to the eastern permit boundary. <br />In June, 1986 a major mine fire occurred in the East Mine. This mine <br />fire forced the sealing of the entire East Mine. In order to continue <br />the mining operation, a new mine was constructed in the same reserve, <br />but in a remote location. This is called the West Mine and operated <br />under the same mine permit as the East Mine. <br />The West Mine was constructed during the fall and winter of 1986. <br />For a time production was trucked first to the crushing and screening <br />plant at the East Mine and then reloaded and trucked to the unit train <br />• loadout. However, some temporary coal handling facilities were later <br />constructed at the West Mine. These consisted of a coal stockpile, <br />surface conveyor, stacker and temporary crushing and screening plant. <br />Additionally, the West Mine had its own shop and small warehouse, a <br />bulk rockdust system, and a bulk fuel handling facility. The West <br />Mine was at first ventilated through a third adit on the West Portal <br />Bench and then later through a new airshaft located approximately 1800 <br />feet inby the West Portal Bench mine adits. <br />Production through the West Mine portals continued until approximately <br />1993 when sufficient recovery of the East Mine allowed a cut through <br />to be made and then a rerouting of the underground conveyor system <br />which allowed coal to flow again directly to the crushing and <br />screening plant. The West Mine remained only as the method for <br />suppling the mine and as additional intake air capacity. <br />The First West Submain entries access the ~~D" Seam from the West Mine <br />portals and were driven approximately 1000 feet on a heading of <br />approximately N 71a W. <br />The South ZII Submain entries were driven at an approximate right <br />angle north to the First West Submain entries and advanced to the II <br />West Submain entries, a distance of approximately 2000 feet. It is in <br />these entries that the West Mine Ventilation Shaft was installed. <br />• <br />The II West <br />right angle <br />East mine a <br />approximate <br />distance of <br />Permit Renewal <br />/PN-04 ~4~q/ay> <br />/a12-106 <br />Submain entries were initially driven at an approximate <br />from the South III Submain entries to the east towards the <br />distance of approximately 6200 feet and then at an <br />right angle to the west to the western permit boundary, a <br />approximately 6200 feet. <br />- 5 - 01103 <br />