2.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROVND MINING ACTIVITIES - <br />MINIMUM REQUIREMENTS FOR OPERATION AND RECLAMATION PLANS. <br />. A change house (pre-engineered) metal building to provide <br />sanitary shower and change room facilities for mine workers was <br />also located on the Portal Level. Office and training space for <br />mine Supervisory, Safety, and Engineering staff was located in <br />the upper level of the change-house facilities. This building <br />was removed during 2000. The foundation for this building <br />remains and will be pushed into the backfill of the East Mine <br />Portal Bench when restored to approximate original contours. <br />An area for fuel, lubricants, and maintenance equipment was lo- <br />cated on this level as well. The superstructure, tanks and <br />piping have all been removed. The foundations remain and will <br />be pushed into the backfill of the East Mine Portal Bench. <br />The main electrical substation for the mine is located at an <br />elevation of 7,140 feet. It reduces the incoming 46 KV power to <br />usable power for underground and surface operations. This <br />substation remains in place and is still operational. <br />At 6,990 feet elevation, the shop and warehouse buildings were <br />of a pre-engineered type on concrete slab foundations. The <br />6vildings were removed during 2000, but the footings remain. <br />Most of the footings will be pushed into the backfill, but some <br />will remain in place and simply buried in the fill under a <br />minimum of 4 feet of cover material. <br />• Across the road from this was a pre-engineered tire shop and <br />ground storage complex used for storage of large mine machinery <br />and storage of supplies. The tire shop has been removed during <br />2000 but the concrete foundations remain. Nearly all of the <br />supplies and machinery have been removed during 2000. <br />Surface Conveyors <br />The coal was conveyed to the surface on enclosed conveyor, C-0. <br />The operator removed this conveyor in 2000. <br />The direction of the conveyor structure was changed at Transfer <br />Tower Number 1. The operator removed this transfer tower during <br />2000. <br />The exiting conveyor, C-lA, emptied into the top of a 2,000-ton <br />surge bin (elevation 7050 feet) which is capable of handling <br />expected peaks in mine production and equalizing flow into the <br />crushing and screening building. The operator removed this <br />conveyor and most of this surge bin during 2000. The concrete <br />base which also contains two vibratory feeders of the 2000 ton <br />surge bin remains along with all of the footers for the <br />conveyor. <br />The operator removed the Crushing and Screening Plant during <br />2000. The concrete footings remain and a portion of the stacker <br />tube. <br />I• <br />Permit Renewal - 12 - 01/03 <br />Rh-o 4 ~4~9~° 4~ <br />/~1IZ-J a 6 <br />