Laserfiche WebLink
contains refuse from the F and B seam. The RPE will contain refuse from the B seam and the E <br />seam that is planned to be mined in the future. The results of the testing showed no potential for <br />producing acid leachate. This discussion is also included for your information. In addition, <br />enclosed is information contained within Exhibit 56 of MCC's permit which further discusses <br />refuse pile leachate. Please note that this information was generated for the LRP and pond MB- <br />2R; however, it is assumed that the same will be true for the RPE and the RPE pond, as the refuse <br />is typical and the pile is designed the same as the LRP. <br />Based on the above information, MCC does not believe the conditions upon which the WQCD <br />approved new Outfa11015 should be changed. <br />Should you have any questions or need additional information concerning this report, please <br />contact me. <br />Sincerely, <br />Q~ <br />my A arbe <br />Enviro ntal Coordinator <br />xc: D. Berry - CDMG - OMLR <br />G. DiClaudio <br />K. Mueller ARCC -Legal <br />P. Schmidt <br />K.G. Welt <br />File 2035 <br />cpds0397.doc <br />