My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60761
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60761
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:33 PM
Creation date
11/20/2007 6:50:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984094
IBM Index Class Name
Permit File
Doc Date
5/25/1984
Doc Name
LIMITED IMPACT 110 AND SPECIAL TEN DAY PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• -4- <br />EXHIBIT F - Proof of Compliance with Local Government Zoning <br />In accordance with 34-32-115(4)(e), the Board must make a finding that the operation <br />will oe in compliance with local zoning or subdivision regulations. You are not <br />required to submit this information, but a submission would assist the Division's <br />processing of the application. When the Uivision notifies the local government of the <br />existence of this application, it will request information regarding compliance with <br />applicable local law. It is intended that operators ,nay concurrently come into <br />compliance with local requirements at the same time the Uivision is processing this <br />application. Infornation regarding the status with local government will be helpful. <br />EXHIBIT G - Source of Legal Right-to-Enter <br />This could be a copy of the lease, deed, abstract of title, or current tax receipt. An <br />acceptable alternative would de a statement acknowledged by a Notary Public that the <br />operator has the legal right to enter the mine. <br />EXHIBIT H - Reclamation Costs <br />For a 11U perrait, if the operator requests financial warranty to be less than #5,000.00, <br />the operator must submit facts to support such a request. Otherwise, a financial <br />warranty of $S,UUD.UU will automatically oe set. For all 111 permits, the financial <br />• warranty shall be $2,500.00 per acre. . <br />EXHIBIT I - Terms of Governmental Contracts (111 Applications only) <br />For Special 10-Day (111) permits, the operator must submit a copy of the contract or <br />other proof that proves the necessity of a Special 10-day perrnit. The operator must <br />also submit evidence of the financial warranty provided under the governmental contract, <br />if it was required. <br />NOTICE PROCEDURES <br />After the application is considered "filed" (pursuant to Rule 1.1(10) with the Mined <br />Land Reclamation Division, notice procedures outlined in ru]e 3.2 and/or 4.2 must be <br />followed. (Format for such notices will be included in the letter you receive from the <br />MLR staff informing you of the Completeness ("filing") of your application.) <br />FINAWCINL WARRAfITY <br />Prior to permit issuance, proper performance and financial warranty must be received in <br />accordance with Rule 7. Please obtain the appropriate form for your chosen method of <br />• financial warranty. <br />
The URL can be used to link to this page
Your browser does not support the video tag.