Laserfiche WebLink
. 3-9 <br />A portion of the soil that has been salvaged by cleaning the sediment pond will <br />be used on the pre-existing access road alignment. <br />Topsoil, primarily the alternate reclamation topsoil from the sediment pond, will <br />be spread on approximately one acre of the mine bench area at depths between 4 and <br />8 inches. The remaining areas will be revegetated directly on existing surface material; <br />the nature of this material if very similar to that of topsoil in the area. See Section 4.4, <br />Soils Inventory. <br />Remaining topsoil wilt be respread on the regraded sediment pond at depths <br />ranging between 4 and 8 inches. The sediment pond area will be reclaimed following <br />successful revegetation of the bench area disturbance. <br />• <br /> <br />M`Clane Volume 1 06/04 <br />