Laserfiche WebLink
6.4.4 Exhibit D -Mining Plan <br />Water Diversions and Impoundments <br />Water diversions will include pumping groundwater from dewatering trenches in <br />Phase I -Cell 4 and precipitation inflows into the mine cells into a sediment pond <br />before discharging to the river. The location of the sediment pond, shown in <br />Exhibit C-2 -Mining Plan, may change during the mining processes such that <br />the sediment pond will always be located in between the current mining operation <br />and the river. <br />Timetable and Size of Mining Areas <br />The mining operation is expected to last for 15-20 years; however this could vary <br />depending upon market conditions. The approximate size of areas to be worked <br />at any one time generally correlates to the size of the mining cells. The <br />exception is on the East Pit when Cell 3 will be partially mined during the non- <br />flood season concurrently with mining of Cell 1. Table 6.4.4-2 shows the mining <br />cell size and the approximate timetable for working each cell. <br />Table 6.4.4-2. Mining Timetable <br />Mining Phase <br />and Cell Area <br />(acres) Approximate <br />Time Complete <br />Each Cell <br />(years) Approximate <br />Cumulative Time <br />Until Complete <br />(years) <br />Phase I -Cell 1 9.4 1.5 - 2 1.5 - 2 <br />Phase I -Cell 2 29.9 4,5 - 5 6- 7 <br />Phase)-Cell3 13.7 2-2.5 8-9.5 <br />Phase I -Cell 4 13.1 2 - 3 10 - 12.5 <br />Phaseil-Cell1 12.2 2-2.5 12-15 <br />Phase II -Cell 2 9.1 1.5 - 2 13.5 - 17 <br />Phase I I -Cell 3 <br />(seasonal mining) 11 4 2- 3 15.5 - 20 <br />TOTAL 99 -- 15.5 - 20 <br />February 20, 2006 Bokelman/Walters Pit <br />Page 5 of 36 Regular 112 Permit Application <br />