Laserfiche WebLink
n <br />LJ <br />Mileage: 1 Round <br />Trip <br />PROJRCT: Seneca Pond 006 <br />LOCATION: Seneca WII Mine <br />CLIRNT: Peaaody Coal Co. <br />SVORH PRRFORMRD: <br />DATR: 10/1R/89 <br />TIMR: 1.0 hours <br />RN~R./TRCHNICIAN: MDS <br />Seneca Mine had placed and compacted on site clay <br />and sandstone fill at Haul Road A from STA. 6+00 to STA. <br />18+00. <br />We conducted nuclear density tests in two areas on the <br />Haul Road that did not meet the specified compaction <br />~ requirement from tha previous day. <br />RRMARHS: <br />All tests conducted toady exceeded the specification <br />requirements. <br />~. <br />Please refer to the attached Nuclear Density test <br />results for details on today's testing. <br />VBRBAL DISCUSSIONS: <br />We spoke with Roy Raro and informed him of today's test <br />results. <br /> <br /> <br />• <br />u <br /> <br />REPORT NO.: 7 <br />PROJRCT NO.: 89-241 <br />