Laserfiche WebLink
~• <br /> <br />Mileage: 1 Rouncl <br />Trip <br />PROJECT: Seneca Pond 006 <br />LOCATION: Seneca WII Mine <br />CLIENT: Peabody Coal Co. <br />DATE: 10/17/R3 <br />TIME: 2.5 hours <br />6NGR./TECRNICIAN: SJM <br />WORH PERFORMED: <br />Seneca Mine had placed and compacted on site clay <br />fill for the dam embankment of Pond 006. The depth of fill <br />averaged 11 feet below the top of the dam. Seneca Mine had <br />also placed and compacted pn site clay and sandstone fill <br />between STA. 6+00 and STA. 18+00 of Haul Road A offset 20 to <br />40 feet right of centerline. <br />We conducted nuclear density tests at several locations <br />in both fill areas. <br />REMARHS: <br />' All tests conducted nn the dam fill indicate compaction <br />levels exceeding the specification requirements. Tn general, <br />the fill placed on Haul Road A meets the compaction <br />requirements. <br />Please refer to the attached Nuclear Density test <br />results for details on today's testing. <br />• <br />VERBAL DISCUSSIONS: <br />Test results were discussed with Roy Karo end Ray Armijo <br />at the site. <br />' Rli l'O HT ':0.: (i <br />PItOJF,CT NO.: £f~-all <br />