Laserfiche WebLink
,, ,,, , <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine Total Fleet Size Haut Trip Retum Trip <br />Description CosUhaur/unit (No. units) CosUhr/fleet CosUhr/fleet <br />-Fuel Tanker, 4x2, 170 HP $45.51 1 $45.51 $45.51 <br />-Flatbed Truck, 6x4, 45K GVW $91.14 1 $91.14 $91.14 <br />Subtotals <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city ar town within project area region : Durango <br />Transoortation Cvcle Time : Non- Total one-way travel tlistance : 20.0 miles <br /> Roadable Roadable Average travel speed : 30.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.67 0.67 Total non-roatlable mob/demob cost' : $7,311.68 <br />Retum time (hours) = 0.87 0.67 ' tvro round trips with haul rig <br />Loading time (hours) = 1.50 NA Total roadable mob/demob cost" : $182.20 <br />Unloading time (hours) = 1.50 NA •• one round trip, no haul ng <br />Subtotals = 4.33 1.33 <br /> <br />> <br />JOB TIME AND COST ,, <br />Total job time : ,_ <br />$,$7 hours <br /> Total iob cost : 57.494 <br />