Laserfiche WebLink
CIRCES Cost Estimatinst Software <br />PROJECT IDENTIFICATION <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Task # : 035 State :Colorado Permitlob # : C-81-035 <br />Date : 11x21/2005 Counly :La Plata Abbreviation :none <br />User : TAK Site :King Coal Mine Filename :C035-035 <br />Permit or other job action : Tr-9 <br />Task description : Mobilize/Demobilize <br />for Initial Reclamation <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 perday <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 90T) <br /> Available rig capacities : 0-25 Tons 2650 Tons 51+ Tons <br />Cost Breakdown : Ownership cosUhour : $24.23 $28.32 $30.84 <br /> OperatingcosUhour. $30.25 $32.95 $34.62 <br /> Operator cosUhour : $26.54 $26.54 $26.54 <br /> Helper cost/hour : $22.70 $22.70 $22.70 <br /> Total Unit CosUhour : $103.71 $110.50 $114.69 <br />Nf1N_RrfAr1AR1 F Fr]IIIPMFNT <br />Machine <br />Description WeighUunit <br />(Tons) Ownership <br />CosUhdunit Haul Rig <br />CosUhr/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhr/fleet Return Trip <br />CosUhdfleet OOT permit <br />CosUfloet <br />-Cat D8R - 8SU 52.22 $49.50 $114.69 1 $164.20 $114.69 $0.00 <br />-Cat621G 35.55 $37.06 $110.50 1 $147.56 $110.50 $0.00 <br />-CAT 12H 15.71 $17.55 $103.71 1 $121.26 $103.71 $0.00 <br />-Cat307C 7.16 $11.18 $103.71 1 $114.89 $103.71 $0.00 <br />-Reveg Equipment 20.00 $66.00 $103.71 1 $169.71 $103.71 $0.00 <br /> <br />-REEDRILL SKSAD, 7.0 in. 26.25 $51.33 $110.50 1 $161.83 $110.50 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $879.44 8846.82 50.00 <br />sheet 1 of 2 <br />