Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 005 <br />Date : 09232005 <br />User : TAK <br />State :Colorado <br />County : La Plata <br />Site :King Coal Mine <br />Agency or organization name : CDMG <br />Permit or otherjob action :TR-9 <br />Task description : FIIIISh <br />HOURLY EQUIPMENT COST <br />Facilities Area <br />Basic machine :CAT 12H <br />Attachment no. 1 :NA <br />Attachment no. 2 : Multi-shank <br />Horsepower: 140 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown Ownership wsUhour : $17.98 NA <br />Grader operating cosUhour : $24.65 100 <br />Ripper operating cost/hour : $0.00 0 <br />Operatorcast/hour : $31.97 NA <br />Total unit cosUhour : $74.60 Total fleet cost/hour : $74.60 <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 1.96 acres <br />Source of estimated acreage :Man C-6 <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 degrees " ' at 0 degrees, blade is perpendiwlar <br />Effective blade length : 10.40 feet to direction or travel. <br />Width of blade overlap per pass : 2.00 feet <br />Net grading or ripping width per pass : 8.40 feet `" "width or ripper beam on ripping applications <br />Unadjusted hourly unit production : 1.2727 acreslhour <br /> <br />Job Condition Correction Factors Source <br />Average site altitude : 7,400 feet Altitude adjustment factor : 0.83 (Cat HB) <br /> Job efficiency adjustment factor : 0.85 (1sh/d, mod.J <br /> Net job correction : 0.7055 multiplier <br />Permii<ob # : C-81-035 <br />Abbreviation :none <br />Filename : C035-005 <br />