CIRCES Cost Estimating Software <br />SCRAPER-ONIV WORK <br />Task # <br />Date <br />User <br />Agency or organization name :GONG <br />004 State :Colorado <br />09?32005 County : La Plate <br />TAK Site :King Ccal Mine <br />Permit or other job action : TR-9 <br />Task description : FIaUI <br />HOURLY EQUIPMENT COST <br />Model:Cat 621G <br />med. to <br />Permitfjob # : C-81-035 <br />Abbreviation :none <br />Filename : C035-004 <br />Facilities Area <br />Shift basis : 1 per day <br />Cost Breakdown : Job utilization °h Horsepower : 365 <br />Ownership cosVhour : $37.06 NA Weight (UST) : 35.55 <br />Operating cosUhour: $79.46 100 Cost data sauroe : (CRGj <br />Operator cosUhour: $32.15 NA <br />Total unit cosVhour: $148.68 Total Beet cosUhour : $148.68 <br />MATERIAL QUANTITIES - - ~ ~~ <br />Initial Swell Loose <br />volume: 1,581 CCY factor : 1.165 volume: 1,842 LCY <br />Source of quantity take-off :1.96 acres X 8"thick (Map C-6 antl reclamation plan) <br />Source of estimated swell factor :DMG estimate <br />Haulinc Caoacily <br />Suaper Payload (weight) Basis <br />Material weight: 2,550 pounds <br />Material description <br />Earth -Dry pecked <br />Rated payload : 48,000 pounds <br />Payload capacity : 18.82 LCY <br />Cvcle Time (load + haul + soread + return) <br />Travel time <br />Bow! (votume) Basis <br />struck volume : 14.00 LCY <br />Heaped volume : 20.00 LCY <br />Average volume : 17.00 LCY <br />Adjusted capacity : 17.00 LCY'•' <br />Loading time <br />Maneuver and spreading time <br />' loading time per pair on pushpull medals <br />2.00 minutes <br />0.70 minutes <br />Route Distance (feet) Grade (%) Roll. res.(%) Total res.(%) Velocity (fpm) Travel time (min.) <br />Haul: 500 0.0 5.0 5.0 1,443 045 minutes" <br />Return: 500 0.0 5.0 5.0 2,472 0.20 minutes" <br />"travel time adlusted for acceleration and depleratign at IoaO arM dump poinb <br />vebcitiea are max. adeinaDle par total resistants snows, rrol average <br />Job Condition Corcedion Factors <br />Site altitude (feet) : 7,400 <br />Altitude adjustment factor : 1.00 ( <br />Job efficiency factor : 0.83 (1 <br />conection factor : 0.83 <br />Total cycle time : 3.35 minutes <br />Adiustetl Houdv Production <br />Unadjusted unit production : 304.11 LCY/Hour"' <br />Adjusted and production : 252.41 LCY/Hour <br />Adjusted flee <br />roduction : <br />t <br />p 252.41 LCY/Hour <br />l1 <br />.~ <br />..'' <br />2 tlme8 V°Wie M pp8..7n~ii mpdai9 <br />ros rrME at4D cosy <br />Fleet size : 1 Scraper(s) Total job time : 7.30 Hours <br />Un8 cost : $0.589 /LCY Total job cost : $1,065 <br />