My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60630
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60630
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:27 PM
Creation date
11/20/2007 6:47:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
3/13/2006
From
pg 2.05.3(3)-10-76 to End
Section_Exhibit Name
NH2 Section 2.05.3(3) Attachment 2.05.3(3)-10 Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8) Haul Roads and Other Facilities <br />General Requirements. WFC will construct, maintain and reclaim haul roads in the <br />amendment area to the same specifications as listed in Section 2.05.3 of the existing permit <br />unless specified differently in this section. The roads will be designed to minimize erosion and <br />siltation, air and water pollution and damage to public and private property. To the extent <br />possible, using the best technology currently available, haul roads will not cause damage to <br />fish; wildlife, or related environmental values and will not cause additional contributions of <br />suspended solids to stream flow or to runoff outside the permit area. <br />Location. The amendment area will have a haul road on both the north and south perimeter of <br />the pit area. These roads will be referred to as the north.and south haul roads, respectively. <br />The north haul road is approximately 5600 feet long and the south haul road is approximately <br />3200 feet long. The plan and profile views of these roads are shown on Map 2.05.3-14. <br />Haul roads at the mine site will be designed with appropriate ditches, grades and culverts to <br />control erosion and runoff. All haul roads will be constructed basically "on-grade", although <br />certain parts of the north haul road will require some minor cutting and filling to maintain <br />. acceptable road grades. Topsoil will be removed and stockpiled in accordance with WFC's <br />topsoil salvage plan. The location will be partially limited by the grades of the existing or <br />postmining areas. Stream fords will not be used during construction of roads unless approval is <br />first obtained from the regulatory authority. <br />Design and Construction. The design of the haul roads incorporate the demand for mobility <br />and.travel efficiency, based on the geometric criteria appropriate for the anticipated volume of <br />traffic, weight and speed of the vehicles to be utilized. The design and construction or <br />reconstruction of haul roads not within the estimated disturbed area will be certified by a <br />registered professional engineer, if required by the CDMG for good cause shown. <br />Should haul roads not within the estimated mining disturbance areas be necessary, they will be <br />designed and constructed or reconstructed in compliance with the following standards in order <br />to control erosion and disturbance of the hydrologic balance. <br />The vertical alignment of the haul roads will not exceed 10 percent on the overall grade. <br />Maximum pitch grade will not exceed 15 percent, and there will not be more than 300 feet of <br />pitch grade exceeding 10 percent within any consecutive 1,000 feet. <br /> <br />(REVISED 12/00) Attachment 2.05.3(3) -10-120 <br />
The URL can be used to link to this page
Your browser does not support the video tag.