Laserfiche WebLink
^~ <br />HOURLY"PRODUCTION: <br />Job"CondYtYon"Corrections <br />I • Alt. = 6,300• ft: . <br />Alt. adjustment . <br />Job efficiency ...(lsh/d) <br />Net Corrections <br />Load Equipment Capacity <br />""""""""""""""""""""""" <br />Rated capacity <br />Bucket fill factor <br />Adjusted capacity <br />Truck Capacity <br />"""""""""""""" <br />Weight Basis: <br />Sheet 2 of 3 <br />Truck/Load Team Support Equipment <br />Truck <br />"""""""""""" Loader <br />""""""" Load Area Dump Area <br />"""""""""""""""""""""" <br />1.000 1.000 1.000 1.000 <br />0.830 0.830 0.830 0.830 <br />-------- - <br />0.830 <br />"""""""" " ------- <br />0.830 <br />""""""" -------- <br />0.830 <br />"""""""" -------- <br />0.830 <br />"""""""" <br />4.250 LCY (nominal heaped) <br />"""""""" Fill material description: <br />0.900 Other - soil, boulders, roots (80-100X) <br />3.825 LCY <br />Material weight = 2,900 lbs/LCY <br />Mat. description """"""" <br />Decomposed rock- 50X Rock, 50% Earth <br />"""""""""""""""""""""""""""""""""""" <br />Rated payload = "26,000 lbs. <br />Payload volume = 8.97 LCY <br />Adj. truck volume based"on discreet nc <br />Volume Basis: <br />Struck capacity = <br />Heaped capacity = <br />Average = <br />Max. Avg. Volume = <br />r. of loader passes: <br />8.00 <br />10.00 <br />9.00 LCY <br />8.97 LCY <br />7.65 LCY <br />Load Equipment Cycle Time <br />""""""""""""""""""""""""" <br />Number of discreet loader passes required to fill truck 2 <br />Track loaders- """"""" <br />Load material description:N/A <br />Excavators/Shovels - cycle time vs. job condition rating: N/A <br />- selected value within basic rating N/A <br />Track loaders -basic cycle time elemen~s: Load time = N/A <br />Maneuver time = N/A <br />Dump time = 0.09 <br />Unadjusted Basic Cycle time _ 0.500 <br />Wheel/Track loaders- """"""" <br />Cycle Time Factors: Description Factor <br />Material -Mixed material 0.020 <br />Pile condition -Conveyor or dozer piled 10'h and up 0.000 <br />Truck Ownership -Common ownership of trucks & loaders -0.040 <br />Operation -Constant operation -0.040 <br />Target -Nominal target 0.000 <br />• Net cycle time adj. _ -0.060 <br />Adjusted Basic Cycle Time = 0.440 <br />Total load time per truck incl. exchange time adj.* 0.530 <br />x(bulk of 1st pass completed during truck exchange) """"""" <br />min. <br />min. <br />(min.) <br />min. <br />min. <br />min. <br />