My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60472
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60472
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:21 PM
Creation date
11/20/2007 6:43:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Exhibit 53 Bond Liability Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
@BCLANATION COST SUNNAB7 cont'd sheet 3 of 4 <br />A, BABPHM08H - STBBAM CBANNBL BBCONST@UCTIOH <br />Task No„ Task Description ; Cost 131 <br />• NA • ; No Strewn Chaunel Becoaetruction is required ; ' 20 <br />....,...r ..................................................'............ <br />Subtotal (H(: !0 <br />------------ <br />I, BA@THY08H - SBDINBNT POND/DIVB@SION DITCB/CBBC@ DAN BBNOVAL <br />Pask No,; Task Description ;. Cost (fl <br />, <br />28A Sediment Pond MB-1 ; (9,310 <br />29 ;Sediment Pond MB-2 (1,116 <br />30 9edinent Pond NB-3 ; (301 <br />31 ; 9edinent Poad NB-4 (194 <br />32 ;Sedinent Poad NB-5 f3,002 <br />33 9edinent Pond NB-6 $3D1 <br />34 Freshxater Pond FY-1 ; f1,298 <br />NA Freshxater Poad FY-2 rill not be constructed ; JO <br />35 ;Channel 1 Sedinent Ditch ; (4,062 <br />36 ;Channels 2-14 Sedinent Ditches ; 52,659 <br />31 Loxer Waste Pile Ditch 1683 <br />Install riprap in permanent diversion ditches ; <br />38A ; Bast Sediment Ditch (refuse pile) ; (66,686 <br />38B Lower SY Sediment Ditch (refuse pile !29,015 <br />38C Clear rater ditch (refuse pile) ; (11,400 <br />• 38D 6enove riprap at Bear Sine 4I SI,BI6 <br />388 ;Remove brush pile at 8eac Nine 41 (1,682 <br />38F fli11 A Gully repair during liability period !20,796 <br /> <br />J. BABTHMOB@ - TOPSOIL/SUBSOIL flBPLACBNBNT <br />Task No.; Task Description <br />39 ' ;Topsoil all Disturbed Areas xith 12-18 im, <br />40 ;Cover refuse pile x/18-24 in of subsoil 1 <br />; <br />; <br />; <br />Suhtotal (11: (112,319 <br />Cost Ifl <br />9231,444 <br />topsoil; (70,751 <br />; <br />, <br />, <br />; <br />, <br />Suhtotal III: -5308,195 <br />
The URL can be used to link to this page
Your browser does not support the video tag.