My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60178
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60178
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:10 PM
Creation date
11/20/2007 6:35:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993050
IBM Index Class Name
Permit File
Doc Date
1/4/1994
Doc Name
DELLACROCE GRAVEL PIT RESOLUTION 93-286 LAND USE 79
From
DELLACROCE PROPERTIES
To
EL PASO COUNTY PLANNING DEPT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I II I II II III IIII III I M <br /> sss <br /> <br />t~ <br />FROM EL Pg50 COUNTY PURCHRSING TO 913038329106 P.01 <br />• Post•It" brand lax tr n al memo 767'1 ~ a w~ ~ <br />January 4, 1994 <br />Raymond F. Dellacroce <br />Dellacroce Properties <br />17 East Arvada St. <br />Colorado Springs, C0 80906-1433 <br />Mark Gephart <br />E1 Paso County Planning Dept. <br />27 E. Vermijo <br />Colorado Springs, CO 80903 <br />Via Facsimile <br />Hard copy by U. S. Mail <br />~ b 0 wry ""~ Mgr ~~urF <br />`°D r~.tiu~.Q iC,~,t `° F..l P,~, . Pls-+~ <br />~!. DhOni I <br />4 -S~ -7e.3o 0 <br />wr ~~ <br />PIS: ~~:'~~ D-^r. <br />Re: Dellacroce Gravel Pit Resolution #93-286, Land use-79 <br />Dear Mark, <br />We are expecting to receive our final approval for mining from <br />the Division of Minerals and Geology on the 31st of January, 1994. <br />As you know, our approval from the County Commissioners in <br />condition number 3 states that trucks hauling gravel shall not use <br />the 18-foot right-of-way portion of Baptist Road unt11 the proposed <br />realignment/by-pass for Baptist Road is constructed. We have come <br />to an agreement with the E1 Paso County Department of Public Works <br />for a complete re-alignment of West Baptist Road. However, Don <br />Smith of the Department of Public Works feels that all of the <br />necessary planning and scheduling may delay the finish of <br />Construction until September 1, 1999. This 15 considered an outside <br />possibility by Don Smith and Max Rothchild with the hope that it <br />could actually be completed much sooner. We would therefore like to <br />ask the County Commissioners for permission to use the 18-foot <br />right-of-way on an interim basis. we would propose using the road <br />beginning with State approval of the permit until the completion of <br />the realignment or until September 1, 1994. <br />Also at this time we could accomplish the recording of a <br />corrected legal description of the pit and sedimentation pond. As <br />I understand from the surveyor there was an error in the calls as <br />recorded because of a "translation error from using maps with <br />different scales." Apparently the maps were right but some of the <br />distances and bearings were slightly off. I am enclosing the <br />corrected legal with this letter. <br />If you need anything further from me to schedule a hearing <br />before the Commissioners please call me at 634-4155. Thank you for <br />your help in this matter. <br />Sincerely, _ <br />R and F. ellacroce <br />RFD/wp <br />•, w1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.