My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-12-11_PERMIT FILE - C1980007A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2001-12-11_PERMIT FILE - C1980007A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 2:28:05 PM
Creation date
11/20/2007 6:34:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
Old Permits
Section_Exhibit Name
Exhibit 07 NPDES Permits
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page 7 <br />Permit No. CO.0038776 <br />A. TERMS A3V~ CONDITIONS <br />5. Compliance Schedule -Salinity ~gport lcontinuedl <br />The perminee shall specifically address a minimum of three forms of crea[ment and/or containment for each point. The <br />report shall describe in detail each form of [reatment/conwinmen[, the associated canstruction costs, the annual operating <br />costs, the expected resulting salt loading that would result from such trea[ment/con[ainmen[, a description of how solids <br />removed would be disposed of [o prevent reentering surface or ground waters and other infortna[ion pertinent [o a <br />demons[ra[ion of the imprac[ibiliry of salt removal. The perminee shall indicate which option is the preferred option. The <br />Division will review [his report. If [he Division determines that it is economically infeasible to construct sal[ <br />removal/minimization facilities, no further action shall be requited. If the Division determines [hat such construction is <br />necessary, the permit may be reopened [o make appropriate modifications. <br />No later than I~ calendar days following each dace identified in the above schedule of compliance, the perminee shall <br />submit either a report of progress or, in the case of specific actions being required by identified dales, a written notice of <br />compliance or noncompliance, any remedial actions taken, and the probability of meeting the next scheduled requirement. <br />In any case in which a compliance schedule haz been timely submi«ed, failure [o obtain [he Divisions approval shall not <br />be considered a violation of the petmi[ unless the Division shows that absence of approval or disapproval has resulted from <br />[he failure of [he perminee to furnish information reasonably required or requested in order to process [he compliance <br />schedule. <br />B. MONITORING REQUIREA~NTS <br />1. Frequencv and Sample Tvoe <br />[n order to obtain an indication of [he probable compliance or noncompliance with [he effluent limitations specified in Pan <br />I.A.1, the perminee shall monitor all effluent parameters a[ the following frequencies. Such monitoring will begin <br />• immediately and last for the life of the permit tmless otherwise noted. The results of such monitoring shall be repotted on <br />[he Discharge Monitoring Report (DMR) (See Pan I.B.2.). <br />(a) Outfalls 004 and 016 <br />Effluent Parameter Measurement Frequencv Sample Tvoe <br />Flow, MGD Weekly Instantaneous <br /> or Continuous <br />Total Suspended Solids, mgi: Monthly Grab <br />Total Iron, mg/P Monthly Grab <br />Settleable Solids, mQ/P blon[ftly Grab <br />Oil and Grease, mg/¢ Weekly Visual <br />pH, s.u. Weekly Grab <br />Total Residual Chlorine, mg/¢(OUTF ALL 004 ONLI~ Weekly Grab <br />Total Dissolved Solids, mg/Q Quarterly Grab <br />Whole Effluent Toxicity, Chronic Quarterly Grab <br />(b) Outfalls 005. 003. 009. 014. 015 and 013 <br />Effluent Parameter Measurement Frequencv Samule Tvoe <br />Flow, MGD Weekly Instancuteous <br /> or Continuous <br />Towl Suspended Solids, mg/¢ Monthly Grab <br />Towl Iron, mg/¢ Ivlonddy Grab <br />Settleable Solids, mP/¢ Monthly Grab <br />Oil and Grease, mg/¢ Weekly Visual <br />pH, s.u. Weekly Grab <br />Tatal Dissolved Solids, mg/Q Quuterly Grab <br />• <br />See Part LC. for Definitions. Amendment No. ~ Issue 9~ ffective APR Ol. 1997 <br /> Amendment Nu. 4 Issue Effective ~~ <br /> J <br />
The URL can be used to link to this page
Your browser does not support the video tag.