Laserfiche WebLink
<br />Mike Long - 2 - <br />C-81-013 - Golden Eagle <br />December 13, 1488 <br />The refuse disposal area has diversion ditches designed for 10-year events. <br />The operator must be notified to modify this design. <br />C-82-055 - Paton Creek <br />The diversions and collection ditches around this pile have been designed for <br />a 100-year and 10-year event. The operator will need to be notified to modify <br />the 10-year designs to 100-year. <br />C-045-81 - Newlin Croek <br />The refuse pile is being used to backfill the lower highwall area. If any <br />refuse is left at the approved site, 100-year desion will need to be addressed <br />for drainage during the permit renewal period. <br />C-81-014 - Southfield <br />The refuse pile drainage is designed for the 10-year event. Redesign will be <br />needed for the 100-year event. <br />C-00-000 - Munger Canyon <br />The designs need to be modified to allow for passing of the 100-year, 24-hour <br />event. They are currently designed for both 2 and 10-year events. The site <br />has not been constructed to dat=. <br />C-81-047 - Orchard Palley <br />The interim phase does not allow for 100-year design for the ditches. The <br />permanent design does. The operator needs to demonstrate that the <br />on-the-ground interim ditches will pass the 100-year event. <br />C-81-047 - Blue Ribbon <br />/ The collection ditch has been designed for a 10-year event. The operator <br />needs to.resize the ditches fora 100-year event and modify the ditches as <br />needed. <br />CMT/yjb <br />1958= <br />