Laserfiche WebLink
COLORADO DIVISION OF MINERALS AND GEOLOGY <br />EQUIP)EIIT TRANSPORTATION RIG CAST DATA iARILSIIEET <br />REVISION LUTE: August. 1994 <br />4gRK5F(EET FILEHA)IE: MTRNS-TK. WIC1 <br />MIfH[NE DESCRIPTION: NFDIUM EWIPNENT (26-50 TONS) TRANSPORT RIG <br />sheet 1 of 2 <br />COST ADJUSTIENT FAL'TORS* BASE VALUE ADJ. VALUE REFERENCES : 1) COST RI;FEREHCE GUIDE <br />irt# Acquisition Cost 5121,412.00 598.702.96 2) CONTRACTORS EQUIPMENT COST GUIDE <br />hailer Acquisition Cost 545.785.00 535.058.07 3) COLORADO CONTRACTORS ASSOCIATION <br />Tractor Econ. Life Hours 9300 11300 NAGE RATE SCHEDULE <br />Trailer Evan. Life Hours 8800 11600 4) CATTFPILLAR PERFORMANCE HANDBOOK <br />Tractor Atuual Use Nours 2112 1100 <br />Trailer Amiual Use Hours 2112 1130 <br />Mech. Labor Cost -Zone A 527.15 522.73 <br />-Zone B 527.15 527.36 <br />Fuel Cost per gallon 50.94 50.94 <br />Cube Cost 51.73 51.73 <br />Tractor Tire Life Hours 1800 1750 <br />Trailer Tire Life Hours 1800 1800 <br />Tractor Tire Pur. Price 56.012.00 56.677.66 <br />Trailer Tire Pur. Price 54.896.00 55.814.70 <br />•(tractor E trailer adj. <br />factors are averaged) <br />~ ~ '--•--- BASE 04diENRIIP 8 OVERHAlL COSTS •------ -•-------• ------ BASE OPERATING COSTS --- ------- <br />BASE MODEL i ATTACHMENTS DESCRIPTION ~ DEPR. CFC OVERHEAD LABOR PARTS LABOR PARTS flEl. LUKE TIRES G.E.C. <br />T r 6x4.75kGYN 510.28 52.06 51.97 51.88 52.68 52.76 32.62 59.70 51.94 53.34 50.00 <br />er SOT.FLGN/DD 53.18 50.75 50.76 50.77 51.17 50.96 51.23 50.00 50.29 52.72 50.00 <br />1 Cf•ent /1 N/A 50.00 50.00 30.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 <br />Attactrent ~2 N/A 50.00 30.00 50.00 50.00 50.00 30.00 50.00 50.00 50.00 50.00 50.00 <br />BASE COST SUBTOTALS 513.46 32.81 52.73 52.65 53:85 53.72 53.85 59.70 52.23 56.06 50.00 <br />~ I ---•-- A0JUSIID OM~RRS)IIP b OVERHAUL COSTS -•-- -•---•---• - ADJUSTID OPERATING COSTS --- --- - .. <br />bST ADJUSTMENT FM10R5 ~ FACTOR VALUE ~ OEPR. CFC OVERHEAD LABOR PARTS LABOR PARTS FUEL LUKE TIRES G.E.C. <br />Acquisition Cost 0.8130 510.94 N/A N/A N/A N/A N/A M/A N/A N/A N/A N/A <br />Ecorroric Life 0.7908 58.65 N/A M/A 52.10 53.04 52.94 53.04 N/A N/A X/A N/A <br />AmuaT Usage 1.8945 520.73 35.32 55.17 N/A M/A N/A N/A N/A N/A N/A N/A <br />Double shifts . 75depr.-.50ohd 515.55 52.66 52.59 N/A N/A N/A N/A N/A N/A N/A N/A <br />Triple Shifts . 67depr.•.33ohd 513.83 51.77 51.72 N/A N/A WA N/A N/A N/A N/A N/A <br />Mechanic Cost - Zone A 0.8371 N/A N/A N/A 51.75 N/A 52.46 N/A N/A N/A N/A N/A <br />- Zone B 0.8604 N/A N/A N/A 31.80 N/A 32.53 N/A WA NIA N/A N!A <br />Fuel/Lube/Tire Lost Variable N/A N/A N/A N/A N/A N/A N/A 59.70 52.23 56.94 50.00 <br />Truck Util. -Zone A 100.00% N/A N/A N/A 51.75 53.04 52.46 53.04 59.70 52.23 56.94 50.00 <br />- Zone 8 LOO.OOt N/A N/A N/A 51.80 33.04 52.53 53.04 59.70 52.23 36.94 50.00 <br />V)JI)S1E0 COST SUBTOTALS: S.SHIFT ZONE A 520.73 55.32 55.17 51.75 53.04 52.46 53.04 39.70 52.23 16.94 50.00 <br /> ZONE B 520.73 55.32 55.17 51.80 53.04 52.53 53.04 59.10 52.23 56.94 30.00 <br /> O.SHIFT ZONE A 515.55 52.66 52.59 51.15 53.04 52.46 53.04 59.10 52.23 56.94 50.00 <br /> ZONE 8 615.55 52.66 52.59 51.80 53.04 52.53 53.04 59.70 52.23 16.94 50.00 <br />• T.SHIFT ZONE A 513.83 51.77 51.72 51.75 53.04 52.46 53.04 59.70 52.23 56.94 50.00 <br /> ZONE B 113.83 51.77 51,72 51.80 53.04 52.53 53.04 59.70 52.23 36.94 30.00 <br />