Laserfiche WebLink
COLORADO DIVISION OF MIIffJtALS A161 GEOLOGY sheet 1 of 2 <br />EQU~ TRAIISPORTATION RIG COST DATA NORKSHEET <br />REVISION OATS: August, 1994 <br />fgRlCSiiFfT FILEW4E: URNS-TK.NK1 <br />W4C11ISE DESfJiIPTiON: LIGHT EQUIPMENT (0-25 TONS) TRANSPORT RIG <br />0057 ADJIbT1F1(i FALTOftS• BASE VALUE ADJ. VALUE REFERENCES: 1) COST REFERENCE GUIDE <br />Trvdc Acpttsltion Cost 5121.412.00 598,702.96 2) CONTRACTORS Ep11PMENT COST GUIDE <br />Trader Aoqulsition Lost 526.115.00 519.998.86 3) COLORADO CONTRACTORS ASSOCIATION <br />iractar Econ. L1fe Hours 9300 11300 NAGS RATE SCHEDULE <br />Trailer Econ. L1fe Hours 8800 11600 4) CATERPIL(AR PERFORMANCE HMmB00K <br />Tractor Amral Use Hours 2112 1100 <br />Trailer Ataatal Use Hours 2112 1130 <br />Nech. Labor Cost -Zone A 521.15 522.73 <br />-Zone B 527.15 523.36 <br />Fuel Cast per gallon 50.94 50.94 <br />Lube Cost 51.73 51.73 <br />Tractor T1re Life Hours 1800 1750 <br />Trailer Tire Life Nours 1800 1800 <br />Tractor Tire Pur. Price 56.012.00 (6.677.66 <br />Trailer itre Pur. Price 52,790.00 53,316.61 <br />•(tractar 8 trailer adj. <br />factors are averaged) <br /> I I ----•-• BASE 0(d1FJLSHIP 5 OVERHAUL COSTS ------- -----••--------- BASE OPERATING COSTS --• ------- <br />BASE MDOEL i ATTACHMENTSI DESCRIPTION ~ DFJ'R. CFC OYER)EAD LABOR PMTS LABOR PARTS FUEL LUKE TIRES G.E.C. <br /> 6 x 4, 75k GVN 510.28 52.06 11.97 51.88 52.68 52.76 52.62 59.70 11.94 53.34 50.00 <br />ler 25T.FLGN/DD 51.81 50.43 50.43 50.77 50.66 50.96 50.70 50.00 50.16 51.55 50.00 <br />tttach~ent.~l WA 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 <br />Attad~ettt /2 H/A 50.00 50.00 t0.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 <br />BASE COST SUBTOTALS : (12.09 52.49 52.40 52.65 53.34 53.72 53.32 59.70 52.30 54.89 50.00 <br /> I I --•--- ADJUSTED OYMERS}lIP b OYERFUWL COSTS ---- --------- -- ADJUSTED OPERATING COSTS --- --..--. <br />DST ADJI1SlTENT FALTpLS ~ FACTOR VALUE I DEPR. CFC OVEWEAD LABOR PMTSI LABOR PMTS FUEL LUKE TIRES G.E.C. <br />Acquisition Cost 0.8130 59.83 N/A WA NIA N!A N!A WA N/A N!A H/A N/A <br />Etooo~lc L1fe 0.7908 57.77 N/A WA 52.10 52.64 52.94 52.63 N/A N/A WA N/A <br />Amaral Usage 1.8945 518.62 54.72 54.55 N/A N/A N/A WA N/A N/A N/A N/A <br />OouDle shifts .75depr.-.SOohd 513.97 52.36 52.27 N/A N/A N/A N/A N/A N/A N/A N/A <br />Triple Shifts .67depr.-.33ohd 512.42 51.57 51.51 N/A N/A N/A WA N/A N/A N/A N/A <br />Mechanic Cost -Zone A 0.8371 N/A N/A WA 51.75 N/A 52.46 M/A N/A N/A N/A N/A <br />- Lone 8 0.8604 N/A N/A M/A 51.80 N/A 52.53 WA N/A N/A H/A N/A <br />Fuel/Lubc/T1re Cost Variable N/A X/A WA N/A N/A N/A N/A 59.70 52.10 55.55 50.00 <br />Truck Util. - Zone A 100.00% N/A NIA WA 51.75 52.64 52.46 52.63 59.70 52.10 55.55 50.00 <br />- Zone B 100.00% N/A N/A N/A 51.80 52.64 52.53 52.63 59.10 52.30 55.55 50.00 <br />~D,IUSTED COST SUBTOTALS: S.SHIFT ZONE A 518.62 54.72 51.55 51.75 52.64 52.46 52.63 59.70 52.10 55.55 50.00 <br /> ZONE B 518.62 54.72 54.55 51.80 52.64 52.53 52.63 59.70 52.10 55.55 50.00 <br /> D.SHIFT ZONE A 513.97 12.36 22.27 fI. IS 52.64 52.46 52.63 59.70 52.10 55.55 50.00 <br />• ZONE B <br />T.SHIFT ZONE A 513.97 <br />512.42 52.36 <br />51.57 52.27 <br />51.51 51.80' <br />51.75 52.64 <br />52.64 52.53 <br />52.46 52.63 <br />52.63 59.70 <br />59.10 52.10 <br />12.)0 t5.55 <br />55.55 50.00 <br />50.00 <br /> ZONE B 112.42 51.57 51.51 51.80 52.64 52.53 52.63 59.70 52.10 55.55 50.00 <br /> <br />