My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26234
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26234
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:44 PM
Creation date
11/20/2007 6:28:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981023
IBM Index Class Name
Hydrology
Doc Date
4/19/1993
Doc Name
STORMWATER MANAGEMENT PLAN
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Srormwata Manabrrnrnt Plan <br />I To further control pollutants at the Reclaimed Chimney Rack Coal Mine, other manage- <br />ment practices will be utilized. While the U.S. Environmental Protection Agency specifies <br />eleven items as significant aspects of stormwater pollution control and management, not all <br />eleven of these practices apply to the Reclaimed Chimney Rock Coal Mine. Those that are <br />implemented are described below. <br />I • Sedimentation and Erosion Prevention. Mitigation measures have already been <br />undertaken for the mine site, specifically sedimentation ponds 002, 003, 004 and 005. <br />l • Preventive maintenance. At the Reclaimed Chimney Rock Coal Mine, preventive <br />maintenance will be practiced at the site to ensure the proper operation of <br />~ sedimentation ponds 002, 003, 004 and 005. <br />• Good housekeeping. The reclaimed site will continue to be kept in a clean, orderly <br />fashion. <br /> <br /> <br />1 <br />~ Non-stormwater discharges. The plan will include certification that stormwater <br />discharge do not contain non-stormwater discharges. This certification will include <br />all portions of the stormwater system including swales, culverts, and ditches. <br />• Visual inspection. The plan will include a visual inspection of the Reclaimed <br />Chimney Rock Coal Mine Site as part of its annual rill and gully inspection program <br />and NPDES monitoring. <br />8 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.