Laserfiche WebLink
• YORKSHEET N0. SE-1 <br /> Support Equipment and Labor <br />Equipment Time Operator Cost/Hr. To[al <br /> Light Plan[ <br /> <br />Light Plants (b)• 250 hrs. f8,48 520.69 ea X 6 535,275 <br />or 132.62 <br />• Dozer work (rough grading) amounts to approximately 1,000 hours each. Therefore, <br />darkness is equal to 25 percent of that time, or 250 hours. <br />• <br />• <br />25-4-23 <br />