Laserfiche WebLink
Mine Area Yoast • <br />Project Sooil Samoling <br />Task Testing and Analysis <br />WORKSHEET N0. SPLSMP-1 <br />MISLELI ANEOUS RECLAMATION ACTIVITIES <br />Description: Spoil sampling of final graded pit areas <br />Equipment: Miscellaneous <br />Volume: From Table 25-2-4, there are 105.2 acres of mining disturbance that will be <br />backfilled and graded. <br />The sampling intensity for final graded spoil will be on a 60-degree slant <br />grid system with 500 foot centers. Therefore, 1 sample covers <br />approximately 5.7 acres of spoil area, or 19 samples will be taken <br />Lost: Lab analysis = 19 samples x E60/sample = E1, 140 <br />Labor = 1 technician x S20/hr x 8 hrs = 160 <br />Equipment = 1 bac khoe 8 1 operator x 8 hrs = <br />E51.51 backhoe/hr + 517.65 Lebo r/hr x 8 hrs = 553 <br />Total = E1.853 <br />• <br />lI 11 <br />u <br />25-4-22a Revisetl 03/27!95 <br />