Laserfiche WebLink
Mine Area Yoast • <br />Project Facilities - Gradinc <br />Task Haul Surface Material <br />WORKSHEET H0. HAULFAC-1 <br />PRODUCTIVITY I~OR SCRAPER USE <br />Description: Haul the top one foot of material to disposal area. <br />Equipment: (2) 637E P-P Scrapers <br />Volume: 33,235 (1 ft. x 20.4 ec) <br />46,495 tons <br />Cost: 50 hr x E199.46/hr = E9,973 <br />• <br />I <br />25-4-14 <br />