My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE59841
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE59841
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:06:55 PM
Creation date
11/20/2007 6:27:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
FACILITIES WORKSHEETS
Section_Exhibit Name
TAB 25 ATTACHMENT 25-4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Hine Area Yoast <br />Project Facilities - Grading <br />Task Rio Facilities Area <br />40RKSHEET N0. RIPFAC-1 <br />PRODUCTIVITY FOR DOZER USE - RIPPING <br />Ripping Activity: Ripping facilites prior to grading <br />Dozer/Ripper Used: D•11N, 3 shank ripper <br />Description of Ripping: <br />rip depth = 3' Volume = 3' deep x 20.4 ac, = 99704 <br />cut spacing = 6.15' per pass <br />cut Length = 300' <br />Productivity Calculations: <br />Cycle time = ( 300 ) ft / 88 fom) + 0.25 = 3.66 min/pass <br />cut length speed turn time <br />• Passes/hour = 45 min/hr / 3.66 min/pass = 72.3 passes/hr <br />pork hr. factor cycle time <br />Volume cut = ( 3 ft x 6.75 ft x 300 ft) / 27cf/cy = 205 bcy/pass <br />tool cut cut <br />penetration spacing length <br />Ripping Production = 205 bcy/pass x 72.3 passes/hr 2.522 bcy/hr <br />Hours Required = ( 99704 bcy / .2522 bch/hr) x - 40 hrs <br />volume hourly <br />to be ripped production <br />Cost = 5254.98 <br />Total Cost = 40 hrs. x 5254.98 cost/hr = 510.200 <br />References: <br />Table 25-2-5 <br />• Attachment 25-2 <br />x n to <br />
The URL can be used to link to this page
Your browser does not support the video tag.