Laserfiche WebLink
_~ <br />T ~. <br />- Wyoming Fuel Co. <br />Golden Eagle Mine <br />• File No. C-81-013 <br />For Approval of Technical Revision 06 <br />Stipulation No. 43 <br />UPON CONSTRUCTION AND PRIOR TO USE OF POND 005, THE OPERATOR WILL LINE THE <br />INTERIOR EMBANKMENTS OF THE POND WITH BENTONITE CLAY OR A SUITABLE LINER <br />APPROVED BY THE DIVISION. <br />Stipulation No. 44 <br />PRIOR TO ANY DISCHARGE FROM POND 005, THE OPERATOR WILL CONSTRUCT AND <br />EMPLOY A LINED DITCH OR PIPELINE TO CONVEY THE DISCHARGED WATER DIRECTLY <br />INTO THE PURGATOIRE RIPER. <br />Stipulation No. 45 <br />THE OPERATOR WILL ADD PAW-7 AS A MONITORING WELL WITH THE SAME <br />REQUIREMENTS AS PAW-5 AND PAW-6. PAW-7 SAMPLING DATA SHALL BE INCLUDED IN <br />THE FOURTH QUARTER HYDROLOGIC MONITORING REPORT FOR 1988 AND ALL PREVIOUS <br />DATA FROM PAW-7 SHALL BE PROVIDED TO THE DIVISION. THE OPERATOR WILL ALSO <br />PROVIDE WELL DESIGN INFORMATION TO THE DIVISION PRIOR TO USING THE POND. <br />Stipulation No. 46 <br />• THE OPERATOR WILL COMPLETE CONSTRUCTION AND INSTIGATE USE OF POND 005 <br />WITHIN 60 DAYS OF FINAL APPROVAL OF TECHNICAL REVISION 06 (TR-06). <br />Stipulation No. 47 <br />THE OPERATOR WILL PROVIDE AN UPDATED FIGURE 1 MAP TO REFLECT THE CHANGES <br />IN STIPULATIONS 43-46 PRIOR TO USING THE POND. <br />/bdc <br />0146G <br />• <br />