Doc Date
12/10/1976
Doc Name
APPLICATION FOR MINING AND RECLAMATION PERMIT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> EXHIBI'P D <br /> MINING PLAN AND TIMETABLE <br /> Mining Plan. Mining o~~~rations will be conducted by first <br /> i <br />i <br />t <br />th <br />i <br />h d <br />li <br />l <br /> s <br />r <br />pp <br />ng <br />e area w <br />t <br />rag <br />nes, <br />oaders, dozers and other <br />' conventional earth-moving equipment. Dredging ponds vrill be <br /> ogened initially by use of drag lines to obtain floating area <br /> for dredge. Dredging will be conducted with six to eight-inch <br /> I <br />conventional gravel dredge presently owned or to be purchased. <br />' S <br />ree <br />s <br />bin <br />d d <br />t <br />i <br />i <br />ill b <br />l <br />t <br />t <br />d <br /> , <br />c <br />n <br />ewa <br />s an <br />er <br />ng equ <br />pmen <br />w <br />on <br />e <br />oca <br />e <br />' shore-side facilities. All waste water or processing water <br /> will be returned to the dredged pond. All material dredged <br />~' and excavated will be used in the production of the mining <br /> operation so that there will be no waste products generated <br />'' from the dredging operation. <br />r' <br />i During the years 1977 through 1991, 17.61 acres wall be <br /> worked. During the years 1992 through 1997, 6 acres w:_11 be <br /> worked. During the years 1998 through 2004, 9 acres will be <br />' <br /> worked. <br /> <br />•' Mining Timetable. Stage I will be commenced in 1977, <br /> starting on the north end of Lake Marjorie and working south. <br /> Completion date is estimated to be 1991. <br />;' Stage II will be commenced in 1992 starting on the south <br /> end of Lake Robert and working north to a diagonal line <br />•, approximately even with the Highline Electric Association <br /> overhead line. Completion date is estimated to be 1997. <br />' <br /> Stage III will be commenced in 1998, starting at tine <br /> Highline Electric Association overhead line in Lake Robert <br /> and working north to the end of the area. Completion dstte is <br />' estimated to be 2004. <br />5 <br />