Laserfiche WebLink
• m. Mine Area P2 Sediment Control Pond 2-3 (Figure EX 15-17) <br />New Pond 2-3 10-Yeaz 24-Hour Storm Main Spillway <br />New Pond 2-3 25-Year 24-Hour Storm <br />Ditches -New Pond 2-3 ] 0-Year 24-Hour Storm <br />n. Mine Area P3 Sediment Control Pond 3-1 (Figure EX 15-18) <br />Pond 3-1 ] 0-Year 24-Hour Storm Main Spillway <br />Pond 3-1 25-Yeaz 24-Hour Storm Emergency Spillway <br />Ditches to Pond 3-1 10-Year 24-Hour Storm <br />o. Mine Area P4 Sediment Control Pond 4-1 (Figure EX 15-19) <br />Sedimentation Pond 4-I (New) ]0-Yeaz 24-Hour Storm Main Spillway <br />Sedimentation Pond 4-1 (New) 25-Year 24-Hour Storm Emergency Spillway <br />Ditches (south) to Pond 4-1 <br />Ditches (north) [o Pond 4-1 <br />p. Mine Area P4 Sediment Control Pond 4-3 (Figure EX 15-20) <br />Pond 4-3 ] 0-Year 24-Hour Storm Main Spillway <br />Pond 4-3 25-Year 24-Hour Storm Emergency Spillway <br />Ditches to Pond 4-3 (except D-1) 10-Year 24-Hour Storm <br />Ditches to Pond 4-3: D-1 <br />/ q. Mine Area PS Sediment Control Pond 5-1 (Figure EX 15-21) <br />• y0l• ~ 10-Year 24-Hour Storm Event for Pond 5-1 <br />25-Year 24-Hour Storm Event for Pond 5-1 <br />100-Year 24-Hour Storm Event for Pond 5-1 <br />r. Mine Area P6 Sediment Control Pond 6-1 (Figure EX 15-22) <br />0-Year 24-Hour Storm Event for Pond 6-1 <br />25-Year 24-Hour Storm Event for Pond 6-1 <br />(0-Year 24-Hour flow Ditch D6-Id-1 <br />100-Year 24-Hour Storm Event for Pond 6-I <br />s. Mine Area Pond P7 Sediment Control Pond 7-1 (Figure EX IS-23) <br />10-Year 24-Hour Storm Event for Pond 7-1 <br />25-Year 24-Hour Storm Event for Pond 7-1 <br />t. Mine Area P7 Sediment Control Pond 7-2 (Figure EX 15-24) <br />10-Year 24-Hour Storm Event for Pond 7-2 <br />25-Yeaz 24-Hour Storm Event for Pond 7-2 <br />u. Mine Area P7 Sediment Control Pond 7-3 (Figure EX 15-25) <br />10-Year 24-Hour Storm Event for Pond 7-3 <br />25-Year 24-Hour Storm Event for Pond 7-3 <br />100-Year 24-Hour Storm Event for Pond 7-3 <br />• <br />iii <br />