Laserfiche WebLink
• d. Fi113 Sediment Control Pond 003 (Figure EX 15-8) <br />10-Year 24-Hour Storm Event for Pond 003 <br />25-Year 24-Hour Storm Event for Pond 003 <br />e. Fill 4 Sediment Control Pond 004a (Figure EX 15-8a) <br />10-Year 24-Hour Storm Event for Fill 4, Pond 004a <br />25-Yeaz 24-Hour Storm Event for Fill 4, Pond 004a <br />f. Fill 5 Sediment Control Pond 005 <br />] 0-Year 24-Hour Storm Event for Pond 005 <br />25-Yeaz 24-Hour Storm Pond 005 Emergency Spillway <br />g. Fi116 Sediment Control Pond 006a (Figure EX I S-9a) <br />0-Year 24-Hour Storm Event for Fi116, Pond 006a <br />25-Year 24-Hour Storm Event for Fill 6, Pond 006a <br />h. Fill 7 Sediment Control Pond 007a (Figure EX 15-9b) <br />10-Year 24-Hour Storm Event for Fill 7 Pond Main Spillway <br />25-Year 24-Hour Storm Event for Fill 7 Pond Main Spillway <br />/oo- yeaw L4-liwY 1~1ov~-. EVea~' -~w Gr! (}Cl~ S i21-~ ~~Z-C17~ <br />i. Fill 8 Sediment Control Pond 008 <br />10-Year 24-Hour Storm Event for Pond 008 <br />25-Year 24-Hour Storm Event for Pond 008 <br />• j. Fi119 Sediment Control Pond 009 (Figure EX 15-11) <br />New Pond 009 ]0-Yeaz 24-Hour Storm Main Spillway <br />New Pond 009 25-Year 24-Hour Storm Emergency Spillway <br />k. Fill 9 Sediment Control Pond 009a (Figure EX 15-] lal <br />Fill 9a Sedimentation Pond Excavated Pond Main Spillway 10-Year 24-Hour <br />Storm <br />Fill 9a Sedimentation Pond Excavated Pond Emergency Spillway 25-Year 24- <br />Hour Storm <br />I. Mine Area P2 Sediment Control Pond 2-2 (Figure EX 15-16) <br />Pond 2-2 Combined Pond 10-Yeaz 24-Hour Storm Main Spillway <br />Pond 2-2 Combined Pond 25-Yeaz 24-Hour Storm Emergency Spillway I.5 ft <br />Water Depth <br />Ditches Area 2-2 West Side 10-Year Design <br />Ditches S-1, S-2, S-3 Area 2-2 West Side 100-Year Design <br />Ditches Area 2-2 West Side -SS 100-Yeaz Ditches <br />Area 2-2 Ditches -East Side 10-Year Design <br />100-Year llitches Area 2-2 Pond East Side <br />• <br />