My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26097
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:38 PM
Creation date
11/20/2007 6:18:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Hydrology
Doc Date
2/3/2000
Doc Name
2nd to 4th Qtr 1999 Inspections
From
PEAK PROJECT MANAGEMENT
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BASIN RESOURCES, INC. <br />SEDIMEN/TATION POND INSPECTION FORM <br />- /'/~-E~ r~,?]R` tn~e~l~~s NPDES No. fnrcc <br />Date of Inspecti <br />EMBANKMENT <br />1. Adequacy of [he vegetative cover: Excellent, odes et Few, ~ Poor <br />2. Erosion forming gullies: Extensive, Some, Very Feva, None <br />3. Is wave action causing erosion: <br />On the upstream embankment? Yes No / <br />At the principal spillway inlet? ~~o ~,r'i ~("~'~ Yes No <br />4. Erosion of the downstream toe of the embankment? <br />The cause of the erosion is attributed to: <br />Yes No / <br />5. Is seepage occurring through the dam? <br />Could this seepage cause potential insmbiliry? <br />Yes No V' <br />Yes No v <br />PRINCIPAL SPILLWAY /y~j Sri; Ilc.'>:;,, _ Cie>~i~~:~~ ~: 7c1-~ ~ G;~~~~~~'~~''~'"-~ <br />- - - 1: Is the principal spillway system in working order? - - -Yes No <br />2. Is the inlet free of debris and restrictive material? Yes No <br />3. Is the discharge outlet free of restrictive material? Yes No <br />~. Is erosion occurring at the discharge outlet'? Yes No <br />Evaluate the severity: Extensive biodera[e Just Staring None <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spillway system capable of passing design storm discharge? <br />Yes No <br />2. Doffs i[ appeaz as if the emergency spillway has dischazged water since [he last inspection? <br />Yes No <br />3. Is erosion occurring a[ any section of the emergency spillway? Yes No <br />Describe the ectent: _. <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been surpassed? Yes No~ <br />If yes.explain:~ranrr~~~t,~vt~~,`~ (,~~~ ['~,~ay«.i/ ~~ ~,., ~nr_~ ( i949 <br />/a'~a~ lviJeL eWoa~ .cyl ~fi h~/c~•J -spzr La H,,,CiNra,T <br />Illeife aU'd any special conilneots concerting potentially dangerous oblems~on the bac c of this <br />sheet! ,,/~ ~~L/ <br />Inspected by: ~w(d~ Sn~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.