My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26097
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:38 PM
Creation date
11/20/2007 6:18:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Hydrology
Doc Date
2/3/2000
Doc Name
2nd to 4th Qtr 1999 Inspections
From
PEAK PROJECT MANAGEMENT
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />- SE CarrlTAr~G~r99E"iffi~ ~`~ NPDES No. /(l77Ai~ <br /> <br />Date of <br />EMBANKMENT <br />1. Adequacy of [he vegetative cover: Excellent, Moderate, ew, Poor <br />2. Erosion forming gullies: Extensive, Some, ery Few None <br />3. ]s wave action causing erosion: <br />On the upstream embankment? Yes No !/ <br />A[ the principal spillway inlet? p/v 3Pr~~ah~ Yes No <br />4. Erosion of the downstream toe of the embankment? Yes No <br />The cause of the erasion is attributed to: <br />5. is seepage occurring through the dam? <br />Could this seepage cause potential instability? <br />Yes No y <br />Yes No y <br />PRINCIPAL SPILLWAY /~~; f~,llw' .- - ~2rt:Ntl[~t' -F~~ Tt•K- Ce+t'~+vr++r~c~~ <br />1. Is the principal spillway system in working or~r? Yes No <br />2. Is the inlet free of debris and restrictive material? Yes No <br />3. Is the discharge outlet free of restrictive material? Yes No <br />~. Is erosion occurring at the discharge outlet? Yes No <br />Evaluate [he severity: Extensive Moderate lust Starting None <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spillway system capable of passing design storm discharge? <br />Yes No <br />2. Does it appear as if the emergency spillway has discharged watmr since the last inspection? <br />Yes No <br />3. Is erosion occurring at any section of the emergency spillway? Yes No <br />Describe the extent: _. <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been surpassed? Yes ruo !~ <br />If yes.explai „~i+s,.v is ~~ ~u -/--:~}rr--- sayr~~jr/s.,t C~~,r,.~~rT <br />_ d_._,.,,,_ 1~~.~o V rwrT GGUat~~1 r_: <br />>;le~e• a11rd any special conifnents concerning potentially dangerous problem goo the back of this <br />sheet! <br />Inspected by: 'Yr, ~ '~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.