Blue Mountain Energy, Inc. <br />1998 Stormwater Annual Report <br />Permit Certification No. COR-040 172 <br />ATTACHMENTS <br />A. Inspections were made and maintenance actions taken to ensure compliance with the <br />permit. Two significant storm events occurred during 1998 that resulted in increased <br />maintenance of Stormwater control structures. No violations of the Stormwater <br />Permit resulted from these storms. <br />On June 17-18 1.85 inches of rain was recorded at the mine. The runoff resulted in a <br />dischazge from Stormwater pond SS-1 (NPDES outfall #008). No major maintenance <br />problems resulted from this storm since it's short term intensities were not great. <br />On July 27 0.82 inches of rain fell at the mine within aone-hour period. This storm <br />was fairly localized and only impacted the D Portal and East Portal portions of the <br />permit azea. Due to this storm's short term intensity and resulting peak flows, <br />extensive maintenance of Stormwater control structures was required on the southern <br />end of the permit area. Many sediment checks had to be cleaned out and repaired. <br />Several culverts required cleaning out as a result of this storm. One culvert at the <br />East Portal could not be cleaned out and was replaced. No major failures occurred <br />which would have resulted in anon-compliant dischazge. <br />Changes made to the Stormwater Management Plan include the following: <br />• Alan Hillard -Mine Manager <br />• Scott Wanstedt -Environmental Engineer <br />• The storage tanks located at the East Portal Area were moved to the D Portal Area <br />between the B Portal and D Portal. This move is affective in January 1999. <br />B. First quarterly inspection - Mazch 24 through 26. Site in compliance with several <br />maintenance items noted. <br />• Several culverts were partially blocked with sediment and required cleaning out. <br />Maintenance work performed <br />• Several road outlets required additional riprap armoring to stop slight downcutting <br />from runoff. Additional riprap was placed. <br />• Several ditch segments needed to be maintained. Ditches were regraded to <br />remove sediment and to restore capacity. <br />Second quarterly inspection -June 12 through 14. Site in compliance with several <br />maintenance items noted. <br />