Laserfiche WebLink
Mine Area Yoast - Vadce Pit • <br />Project Construct Final Drainaue Channel <br />Task Construct Channel <br />NORKSHEET N0. WA-70 <br />CONSTRUCT FINAL DRAINAGE CHANNEL <br />Description: Lay Geotextile fabric, load and place riprap <br />Equipment: 9920 Endloader, 2 Laborers <br />Volume: Riprep - 4200'L X 28' Y X 0.15 D = 3300 CY <br />Geotextile Fabric - 4200' X 30'N = 126,000SF or 14,000SY <br />Cost: Riprap - S20/CY 3300 CT X S20 = E66.000 <br />Geotextile Fabrie - 51.265Y 74,000SY X 57.26 = 577.640 <br />992C = 5213.76 <br />Labore rs(2) = 35.38 <br />Total = f248.54 • <br />24 hrs X 5248.54 = 55.965 <br />Dozer 5597 <br />Total Cost 590.202 <br />u <br />25-3.10 Revised 06/79/95 <br />