Laserfiche WebLink
• Mine Area Yoast - Wadoe Pit <br />Project Construct Final Drainage Channel <br />Task Doze Channel <br />WORKSHEET N0. WA-9 <br />PRODUCTIVITY FOR D02ER USE - GRADING <br />Dozing Activity: Doze spoil to create final drainage channel <br />Dozer Used: D-11N, U-Blade <br />Description of Dozing: 100' Push <br />Volume: 3,932 BCY <br />4,600 LCY <br />Productivity Calculations: <br />Operating: 75 <br />Grade: see EMF <br />• Material Factor: see EMF <br />Push Distance: see EMF <br />Dozing Factor: see EMF <br />Visibility: 90 <br />Altitude: 91 <br />Dual Tilt: 105 <br />Spoil Pile Factor: see EMF <br />Minutes Worked per Hour: 50 <br />Bank Material Density: see EMF <br />Loose Materiel Density: see EMF <br />Direct Drive Trans: 100 <br />Total Adj. Factor: 0.6035 <br />Cost Per Hour = 5198.94 <br />Total Cost = 3 hrs. x 5198.94 cost/hr = 5597 <br />REFERENCES: <br />EMF Worksheets <br />Attachment 25-6 <br />• <br />25-3-9 Revised 06/19/95 <br />