Laserfiche WebLink
EXHIEIT E - Reclamation Plan <br />The Reclamation Plan is to drain the excavated area in the same manner as it <br />was previous to excavation, that is, from North Sdest to South East with ap- <br />• proximately one per cent grade. Diversion dikes or ditches will be constructed <br />to channel the runoff into the existing arroyas or gulleys. The seeding will <br />be done in accordance with the Soil Conservation Dept. reccommendation shown <br />in Exhibit I and J. Six to twelve inches of topsoil will be placed and all <br />slopes flattened to 3:1 or greater. <br /> <br />DEC ] 31977 <br />Po11iiFD LF1iVD NFCIl~srn.~iDfiJ <br />Cole. Dept. u' ~~.~[u,a; ;~,;sc.,ces <br />