My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE59249
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE59249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:01:33 PM
Creation date
11/20/2007 6:11:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004030
IBM Index Class Name
Permit File
Doc Date
6/10/2004
Doc Name
2nd Adequacy Ltr
From
DMG
To
T Bone Stone Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : Or'~10/2004 <br />User : TAS <br />State :Colorado <br />County :Boulder <br />Site :T Bone Stone Quarry <br />Agency or organization name :Division Of Minersls 6 Geolo <br />Permit or other job action :Final Reclamation <br />Task description : Re-spread 5326 CGbIC <br />HOURLY EQUIPMENT COST <br />Of <br />Basic machine :Cat DSR Series 11 - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : NA <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $43.83 NA <br />OperatingcosUhour : $69.48 100 <br />Ripper op, cost/hour : $0.00 NA <br />Operator cost/hour : $31.83 NA <br />Total unit cosUhour : $145.14 Total fleet costlhour : x145.14 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,326 LCY factor : NA volume : 5,326 LCY <br />Source of estimated volume :permit <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 100 feet <br />Unadjusted hourly production : 852.6 LCY/hr <br />Material consistency description <br />Average push gradient : 2.00 % (r <br />Average site altitude : 6,000 feet <br />.Material weight : 1,600 Ibs/LCY <br />Weight description <br />TOp SOII <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.230 /LCY <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.20 <br />Visibility ; 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.60 <br />Push gradient : 1.05 <br />Altitude : 1.00 <br />Material weight : 1.44 <br />Blade type : 1.00 <br />Net correction : 0.74 <br />Adjusted unit production : 632.00 LCY/hr <br />Adjusted fleet production : 632.00 LCY/hr <br />Total job time : 8.43 Hours <br />Total job cost : x1,223 <br />PermiUjob# : M-2004-030 <br />Abbreviation :none <br />Filename :M030-001 <br />Horsepower: 310 <br />
The URL can be used to link to this page
Your browser does not support the video tag.