Revised 1 1 i98 <br />Section 780.111a) Continued. <br />• All of the remaining material or approximately 7.1 million cubic yards from the former <br />overburden stockpile was hauled to and placed as backfill in the 720 Pit. Mining <br />continued in Pit 1 through January 1993 when the remaining reserves were <br />exhausted. Subsequent to approval of TR-07 in July 1990, all production overburden <br />from Pit 1 was direct hauled and placed as backfill in the south end of Pit 1. Direct <br />haul backfill material was supplemented by approximately 800,000 Bcy of additional <br />fill generated by backsloping Pit 1 highwall areas. Both direct haul backfilling and <br />backsloping activities in Pit 1 were completed prior to May 1994. At that time, a <br />Phase 1 Bond Release inspection resulted in a dispute with OSMRE over interpretation <br />and application of AOC restoration requirements. By consensual agreement, Kerr <br />committed to and placed additional supplemental fill in the Pit 1 reclaim area in order <br />to resolve outstanding AOC issues. The source of the supplemental fill material was <br />the existing Bush Draw road fill (approximately 27,000 cubic yards) and a previously <br />disturbed and unreclaimed area in the southern portion of Pit 1 (approximately <br />390,400 cubic yards). Final backfilling and grading of the Pit 1 area was completed in <br />1996. <br />u <br />L <br />TR-19 780-3c Revised 11/98 <br /> <br />