My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE59194
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE59194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:01:30 PM
Creation date
11/20/2007 6:10:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
PART 780 Minimum Requirements for Reclamation & Operations Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Revised 04/20/90 <br />Section 780.11(a] Continued. <br />be no steeper than 10 percent or also 2,650 linear feet. A 300 <br />linear foot buffer zone is provided in the pit bottom (between the <br />working face and the backfill face) to assure that recoverable coal <br />is not covered by backfilling operations, and to allow enough room <br />to safely maneuver equipment in the pit bottom. Given the above <br />constraints, the required pit length will be approximately 5,600 <br />linear feet. <br />The highwalls on either side of the pits have been designed by CTL <br />Thompson, Inc. (See Exhibit 43, Analysis of Pit Wall Stability) to <br />provide the optimum combination of safety and coal recovery. In <br />Figure 32, Typical Pit Cross-Section, two 25 foot wide benches are <br />• provided on the west pit wall to catch any material which might <br />slough off the highwall, and to prevent any sloughed material from <br />collecting and thus contaminating the coal. The east highwall has <br />a series of 40 foot wide benches which serve to stabilize the <br />highwall, to catch slough material, and to provide haulage ways for <br />overburden haulage between the working and backfill faces. The pit <br />width varies slightly with an average width of approximately 750 <br />feet. <br />The constraints of open pit mining of the type described above and <br />as visually depicted on Figure 33, Typical Steady State Pit, and <br />Figure 32, Typical Pit Cross-Section dictate that the volume of <br />overburden that must be removed and stored or replaced outside of the <br />active mining area to accommodate the open pit is approximately <br />8,200,000 bank cubic yards. Sample calculations relating to this <br />volume can be found in Exhibit 50, Overburden Volume Calculations. <br />_~ As depicted by Map 33, Kerr Mine Area Overburden Replacement and <br />Grading, all remaining overburden to be removed from Pit 1 rill be <br />direct hauled within the pit and backfilled into the south end of Pit <br />1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.