My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE59030
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE59030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:01:21 PM
Creation date
11/20/2007 6:06:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
Permit File
Doc Date
3/27/2003
Doc Name
Condition #1
From
GCC Rio Grande Inc
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II <br />SOP #: GW 0001 <br />Region I Low Stress <br />(Low Flow) SOP <br />' Revision Number: 2 <br />Date: July 30, 1996 <br />Page 6 of 13 <br />parameters. Adjustments are best made in the first fifteen minutes <br />' of pumping in order to help minimize purging time. During pump <br />start-up, drawdown may exceed the 0.3 feet target and then "recover" <br />as pump flow adjustments are made. Purge volume calculations should <br />utilize stabilized drawdown value, not the initial drawdown. Do not <br />' allow the water level to fall to the intake level (if the static <br />water level is above the well screen, avoid lowering the water level <br />into the screen). .The final purge volume must be greater than the <br />stabilized drawdown volume plus the extraction tubing volume. <br />' Wells with low recharge rates may require the use of special pumps <br />capable of attaining very low pumping rates (bladder, peristaltic), <br />and/or the use of dedicated equipment. If the recharge rate of the <br />well is lower than extraction rate capabilities of currently <br />' manufactured pumps and the well is essentially dewatered during <br />purging, then the well should be sampled as soon as the water level <br />has recovered sufficiently to collect the appropriate volume needed <br />for all anticipated samples (ideally the intake should not be moved <br />' during this recovery period). Samples may then be collected even <br />though the indicator field parameters have not stabilized. <br />3b. Subsequent Low Stress Sampling Events <br />' After synoptic water level measurement round, check intake depth and <br />drawdown information from previous sampling event(s) for each well. <br />Duplicate, to the extent practicable, the intake depth and extraction <br />rate (use final pump dial setting information) from previous <br />event(s). Perform purging operations as above. <br />' 4. Monitor Indicator Field Parameters <br />During well purging, monitor indicator field parameters (turbidity, <br />temperature, specific conductance, pH, Eh, DO) every three to five <br />minutes (or less frequently, if appropriate). Note: during the early <br />phase of purging emphasis should e put on minimizing and stabilizing <br />pumping stress, and recording those adjustments. Purging is <br />considered complete and sampling may begin when all the above <br />indicator field parameters have stabilized. Stabilization is <br />considered to be achieved when three consecutive readings, taken at <br />three (3) to five (5) minute intervals, are within the following <br />limits: <br />turbidity (10% for values greater than 1 NTU), <br />DO (10s) , <br />specific conductance (3%), <br />temperature (3%), <br />pH (± 0.1 unit), <br />ORP/Eh (± 10 millivolts). <br />All measurements, except turbidity, must be obtained using a flow- <br />through-cell. Transparent flow-through-cells are preferred, because <br />they allow field personnel to watch for particulate build-up within <br />the cell. This build-up may affect indicator field parameter values <br />
The URL can be used to link to this page
Your browser does not support the video tag.